The Analysis of Plant Location Effectiveness the Study of Sarir Gas Turbine 855 MW Project Site at General Electric Company of Libya

Authors

  • Khaled Emraje Mohamed Elderjy

  • Djamhur Hamid

  • Hamidah Nayati Utami

Keywords:

libya, sarir gas turbine, plant location effectiveness

Abstract

The study presents a reporton Sarir Gas turbine industrial management especially for economical sustainable operation and proper element of plant management due to particularly design of an oil transportation system. It is found that the company is doing relative with some operational challenges and many people in Libya is rely on it and the influence of Government policies and programs on plant locations is quite helpful, particularly in planned economies area.

How to Cite

The Analysis of Plant Location Effectiveness the Study of Sarir Gas Turbine 855 MW Project Site at General Electric Company of Libya. (2014). Global Journal of Management and Business Research, 14(A8), 25-30. https://journalofbusiness.org/index.php/GJMBR/article/view/1468

References

Andrew Kusiak, Sunderesh Heragu (1987) The facility layout problem. 29(3), 229-251.

Thomas Brush, Catherine Maritan, Karnani, Aneel (1999) Plant location decision in multinational manufacturing firms: An empirical analysis of international business and manufacturing Strategy perspective. 8(2), 109-132.

C Potts, J Whitehead (2001) Workload balancing and loop layout in the design of a flexible manufacturing system. 129, 326-336.

Avorty Chakr (2009) Improving distribution operations: Implemen-tation of material handling systems. 122, 89-106.

Kadokawa Kazuo (2011) Infrastructure support and new plant formation: A factor analysis approach. 4(4), 231-242.

John Thornton (1974) Influence of apparatus geometry and deposition conditions on the structure and topography of thick sputtered coatings. 11(4), 666-670.

Suresh Kumar (2008) Production And Operations Management New Age International (P) Limited.

Yasuhiro Monden (1983) Applying the Toyota Production System Overseas. 335-348.

Karande Prasad, Shankar Chak, Raborty (2012) Material Handling Equipment Selection Using Weighted Utility Additive Theory. 2013, 1-9.

M Piore, C Sabel (1984) The Second Industrial Divide.

M Porter, D Yegin (2006) Libya (Socialist People's Libyan Arab Jamahiriya). 729-729.

R Vaidya, P Shende, N Ansari, S Sorte (2013) International Journal of Engineering and Advanced Technology. 2(3).

Robin Liggett (2000) Automated facilities layout: past, present and future. 9(2), 197-215.

Bellony Nzemenoh, Arianne Agdamag, Valmiki Maharaj, Victoria Charpentier, Kellen Albrecht, Tamas Alexy (1997) MIS-A associated myocardial injury: The art of diagnosis and follow-up. 2(6), 55455.

S Anil, N Kumar, Suresh (2008) Chapter 4. Case Management: The Primary Clinician. 2, 89-112.

S Onut, S Kara, S Mert (2009) Selecting the suitable material handling equipment in the presence of vagueness. 44(7-8), 818-828.

Shubin John, A, H Madeheim (1986) Plant Layout.

Sienny Sujono, R Lashkari (2007) A multi-objective model of operation allocation and material handling system selection in FMS design. 105(1), 116-133.

(2009) Computer Processing of Oriental Languages. Language Technology for the Knowledge-based Economy. II.

G Vieira, G Pasa, M Borsa, G Milan, A Pandolfo (2011) Materials Handling Management: a Case Study Journal of Operations and Supply Chain Management. 4, 19-30.

The Analysis of Plant Location Effectiveness the Study of Sarir Gas Turbine 855 MW Project Site at General Electric Company of Libya

Published

2014-10-20

How to Cite

The Analysis of Plant Location Effectiveness the Study of Sarir Gas Turbine 855 MW Project Site at General Electric Company of Libya. (2014). Global Journal of Management and Business Research, 14(A8), 25-30. https://journalofbusiness.org/index.php/GJMBR/article/view/1468