An Analysis of Factors Determining the Viability of Locally Owned Construction Firms in South West Nigeria

Authors

  • Oladimeji Olubimbola

Keywords:

Abstract

Locally owned construction firms (LOCOFs) is strategic to national development and its viability is germane to a virile economy. To this end, this paper identified and examined various factors determining the viability of LOCOFs. A sample size of 65 staff of 31 LOCOFs out of a total survey of 117 staff of 59 LOCOFs that were awarded building contract in selected institutions in South west Nigeria were accessed for this study. Thirty seven factors influencing the viability of construction business were identified from literature and staff of LOCOFs requested to rate each factors on a 5 point like rt scale of importance. Relative importance index and factor analysis were used to identify and summaries the most important factors. Nine of the 37 factors influence the viability of LOCOFs most and the three topmost factors were: organisational competence (relative importance index (RII) = 0.88), cash for construction work (RII = 0.87) and quality of work and services (RII = 0.86). Also, 11 component factors were obtained from the factor analysis to describe the determinant of the viability of LOCOFs. Three topmost factors of the 11 were: effective management of individual project (9.27%); improved construction method (8.86%); and clients’ satisfaction related issues (8.46%). These factors when well harness could significantly improve the viability of LOCOFs with a resultant expected positive impact on the construction business.

How to Cite

An Analysis of Factors Determining the Viability of Locally Owned Construction Firms in South West Nigeria. (2017). Global Journal of Management and Business Research, 17(34), 31-41. https://journalofbusiness.org/index.php/GJMBR/article/view/

References

Adnan Abidali, Frank Harris (1995) A methodology for predicting company failure in the construction industry. 13(3), 189-196. https://doi.org/10.1080/01446199500000023

Olugboyega Adams (1997) Contractor development in Nigeria: perceptions of contractors and professionals, Construction Management and. 15(1), 95-108. https://doi.org/10.1080/014461997373141

A. Aibinu (2007) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute.

F. Alabi (2010) The macroeconomic review of building and construction sector in Nigeria:pre 1980-2006 In: Laryea, S.

Henry Alinaitwe, Jackson Mwakali, Bengt Hansson (2007) Factors affecting the productivity of building craftsmen - studies of Uganda. 13(3), 169-176. https://doi.org/10.3846/13923730.2007.9636434

O. Aje, K. Odusami, D. Ogunsemi (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. 14(2), 171-187.

O. Ameh, A. Soyingbe, K. Odusami (2010) Significant factors causing cost overruns in telecommunication projects in Nigeria. 15(2), 46-67.

K. Bala, A. Bello, B. Kolo, S. Bustani (2009) Factors inhibiting the growth of local construction firms in Nigeria. 7-9.

Biomedicine (2013) WWW. http://www.biomedcine.org/biology-dictionary/viability

Che Wan Putra, F. Ahmad, A. Majid, M. Kasim, N. (1999) Improving material scheduling for construction industry in Malaysia. 99, 6-8.

Ezekiel Chinyio, Paul Olomolaiye, Pauline Corbett (1998) An evaluation of the project needs of UK building clients. 16(6), 385-391. https://doi.org/10.1016/s0263-7863(98)00001-5

Qingbin Cui, Makarand Hastak, Daniel Halpin (2010) Systems analysis of project cash flow management strategies. 28(4), 361-376. https://doi.org/10.1080/01446191003702484

D. Edwards, Thorpe, T. Love, P. (2004) Journal of Financial Management of Property and Construction. 9(1), 3-12.

M. El-Mashaleh, R. Minchin, W. O'Brien (2007) Management of Construction Firm Performance Using Benchmarking. 23(1), 10-17. https://doi.org/10.1061/(asce)0742-597x(2007)23:1(10

T. Ellhag, A. Boussabaine (1999) Evaluation of construction costs and time ttributes, in Hughes. 2, 473-480.

E. Fatoye (2012) Contributing factors of delay in the Nigerian construction industry: A comparative analysis with other selected countries In: Laryea, S., Agyepong, S.A., Leiringer, R. and Hughes. 575-587.

D. Fang, X. Huang, Jimmie Hinze (2004) Benchmarking Studies on Construction Safety Management in China. 130(3), 424-432. https://doi.org/10.1061/(asce)0733-9364(2004)130:3(424

D. Graham, S. Smith, I. Tommelein (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (Ed.), 21st Annual ARCOM Conference, 7-9 September 2005, SOAS, University of London. 2, 993-1003.

M. Halim, M. Jaafar, O. Osman, S. Akbar (2010) The Contracting firm's failure and financial related factors: a case study of Malaysian contracting firms. 52, 28-39.

Hany AbdElshakour, M. Ali, Ibrahim Al-Sulaihi, Khalid Al-Gahtani (2013) Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia Journal of King Saud University - Engineering Sciences. 25, 125-134.

A. Idrus, J. Newman (2002) Construction related factors influencing the choice of concrete floor systems. 20(1), 13-19. https://doi.org/10.1080/01446190110101218

M. Jean (2013) Viability of a business.

Serdar Kale, David Arditi (1999) Age-dependent business failures in the US construction industry. 17(4), 493-503. https://doi.org/10.1080/014461999371411

A. Kaka, D. Cheetham (1997) the effect of some tendering and payment strategies on contractors' financial performance. 2, 568-577.

Roozbeh Kangari, Foad Farid, Hesham Elgharib (1992) Financial Performance Analysis for Construction Industry. 118(2), 349-361. https://doi.org/10.1061/(asce)0733-9364(1992)118:2(349

Hyung Kim, Kenneth Reinschmidt (2006) A dynamic competition model for construction contractors. 24(9), 955-965. https://doi.org/10.1080/01446190600799729

Almula Koksal, David Arditi (2004) Predicting construction company decline. 130(6), 799-807. https://doi.org/10.1061/(asce)0733-9364(2004)130:6(799

Helen Lingard, Noni Holmes (2001) Understandings of occupational health and safety risk control in small business construction firms: barriers to implementing technological controls. 19(2), 217-226. https://doi.org/10.1080/01446190010002570

Robert MacCallum, Keith Widaman, Kristopher Preacher, Sehee Hong (1999) Sample Size in Factor Analysis: The Role of Model Error. 36(4), 611-637. https://doi.org/10.1207/s15327906mbr3604_06

Sai Nudurupati, Tanweer Arshad, Trevor Turner (2007) Performance measurement in the construction industry: An action case investigating manufacturing methodologies. 58(7), 667-676. https://doi.org/10.1016/j.compind.2007.05.005

John Oakland, Marton Marosszeky (2006) Total Quality in the Construction Supply Chain. https://doi.org/10.4324/9780080455280

H. Odeyinka, C. Davison, P. Olomolaiye (2005) An assessment of factors inhibiting designers from complying with health and safety regulations in their design, Proceedings of 21st Annual ARCOM Conference, 7-9September, SOAS. 2, 905-913.

H. Odeyinka, A. Kaka, R. Marledge (2003) An evaluation of construction cash flow management approaches in contracting organizations. In: Greenwood, D J (Ed.), 19th Annual ARCOM Conference, 3-5 September 2003, University of Brighton. 1, 33-41.

O. Oladimeji, G. Ojo (2012) An appraisal of indigenous limited liability construction company in South-Western Nigeria In: Laryea, S., Agyepong, S.A., Leiringer, R. and Hughes. 1095-1109.

A. Olugboyega (1995) Indigenous contractors' perceptions of the constraints on contractors' performance and development programmes required in Nigeria. 19(4), 599-613.

Kristopher Preacher, Robert MacCallum (2002) Exploratory Factor Analysis in Behavior Genetics Research: Factor Recovery with Small Sample Sizes. 32(2), 153-161. https://doi.org/10.1023/a:1015210025234

S. Peterson (2009) Construction accounting and financial management (2ndEdn.

R. Ramirez, Alarco´ L.F.C, P. Knights (2004) Benchmarking System for Evaluating Management Practices in the Construction Industry. 20(3), 110-117. https://doi.org/10.1061/(asce)0742-597x(2004)20:3(110

C. Semyalo, H. Alinaitwe, A. Kerali (2012) Causes of financial loss to contractors in the Uganda construction industry In: Laryea, S., Agyepong, S.A., Leiringer, R. and Hughes. 24-26.

J. Wells (1998) the informal sector and the construction industry. 21-23.

A. Wahab, A. Lawal (2011) an evaluation of waste control measures in construction industry in Nigeria. 5(3), 246-254.

Qi Wang, Mohamed El-Gafy, Jingmin Zha (2010) Bi-Level Framework for Measuring Performance to Improve Productivity of Construction Enterprises. 2, 970-979.

A. Windapo, O. Martin (2010) An investigation into Nigerian property construction companies' perception of critical risk. 1(1). https://doi.org/10.21511/imc.1(1).2010

Ilhan Yu, Kyungrai Kim, Youngsoo Jung, Sangyoon Chin (2007) Comparable Performance Measurement System for Construction Companies. 23(3), 131-139. https://doi.org/10.1061/(asce)0742-597x(2007)23:3(131

An Analysis of Factors Determining the Viability of Locally Owned Construction Firms in South West Nigeria

Published

2017-12-15

How to Cite

An Analysis of Factors Determining the Viability of Locally Owned Construction Firms in South West Nigeria. (2017). Global Journal of Management and Business Research, 17(34), 31-41. https://journalofbusiness.org/index.php/GJMBR/article/view/