Lean Process Mapping Techniques: Improving the Care Process for Patients with Oesophageal Cancer

Authors

  • Kjeld H Aij

  • Guy Widdershoven

  • Merel Visse

Keywords:

Lean, oesophageal cancer, value-stream mapping, process improvement

Abstract

Abstract not found

How to Cite

Lean Process Mapping Techniques: Improving the Care Process for Patients with Oesophageal Cancer. (2014). Global Journal of Management and Business Research, 14(7), 57-64. https://journalofbusiness.org/index.php/GJMBR/article/view/

References

Spear SJ (2005) Fixing health care from the inside, today. 83(9), 78.

D. Weinstock (2008) Lean healthcare. 23(6), 339-341.

Ann Rogers, Wei-Ting Hwang, Linda Scott, Linda Aiken, David Dinges (2004) The Working Hours Of Hospital Staff Nurses And Patient Safety. 23(4), 202-212. https://doi.org/10.1377/hlthaff.23.4.202

Graban M (2011) Lean Hospitals: Improving Quality, Patient Safety, and Employee Engagement.

de M, Busse R, Güttler F, Reinhold T, Vollnberg B, Kentenich M (2012) Process mapping of PTA and stent placement in a university hospital interventional radiology department. 3(4), 329-336. https://doi.org/10.1007/s13244-012-0147-2

T. Brown, R. Duthe (2009) Getting 'Lean': hardwiring process excellence into Northeast Health. 23(1), 34-38.

Melanson SE, Goonan EM, Lobo MM, Baum JM, Paredes JD, Santos KS (2009) Applying Lean/Toyota Production System Principles to Improve Phlebotomy Patient Satisfaction and Workflow. 132(6), 914-919. https://doi.org/10.1309/ajcp7fikzvvtftxq

Joe Rutledge, Min Xu, Joanne Simpson (2010) Application of the Toyota Production System Improves Core Laboratory Operations. 133(1), 24-31. https://doi.org/10.1309/ajcpd1mstivzi0pz

J. Van den Heuvel, R. Does, De Koning, H. (2006) Lean Six Sigma in a hospital. 2(4), 377-388.

Christopher Kim, James Hayman, John Billi, Kathy Lash, Theodore Lawrence (2007) The Application of Lean Thinking to the Care of Patients With Bone and Brain Metastasis With Radiation Therapy. 3(4), 189-193. https://doi.org/10.1200/jop.0742002

J. Uker (2004) The Toyota Way.

Teichgräber UK, de M (2012) Applying valuestream mapping techniques to eliminate non-valueadded waste for the procurement of endovascular stents. 81(1), e47-e52.

A. Grove, J. Meredith, M. Macintyre, J. Angelis, K. Neailey (2010) UK health visiting: challenges faced during lean implementation. 23(3), 204-218. https://doi.org/10.1108/17511871011061037

Ibon Serrano Lasa, Rodolfo Castro, Carlos Laburu (2009) Extent of the use of Lean concepts proposed for a value stream mapping application. 20(1), 82-98. https://doi.org/10.1080/09537280802685322

Singh Gill, P. (2012) Application of value-stream mapping to eliminate waste in an emergency room. (6). http://medicalresearchjournal.org/index.php/GJMR/article/view/282

T. Yousri, Z. Khan, D. Chakrabarti, R. Fernandes, K. Wahab (2011) Lean thinking: Can it improve the outcome of fracture neck of femur patients in a district general hospital?. 42(11), 1234-1237. https://doi.org/10.1016/j.injury.2010.11.024

Jami DelliFraine, James Langabeer, Ingrid Nembhard (2010) Assessing the Evidence of Six Sigma and Lean in the Health Care Industry. 19(3), 211-225. https://doi.org/10.1097/qmh.0b013e3181eb140e

T. Joosten, I. Bongers, R. Janssen (2009) Application of lean thinking to health care: issues and observations. 21(5), 341-347. https://doi.org/10.1093/intqhc/mzp036

G. Lang, V. Konda (2013) Early diagnosis and management of esophageal and gastric cancer. 59(4), 357-376.

Brechtje Grotenhuis, Bas Wijnhoven, Frank Grüne, Jasper Van Bommel, Hugo Tilanus, J. Van Lanschot (2010) Preoperative risk assessment and prevention of complications in patients with esophageal cancer. 101(3), 270-278. https://doi.org/10.1002/jso.21471

Marjolein Sikkema, Pieter De Jonge, Ewout Steyerberg, Ernst Kuipers (2010) Risk of Esophageal Adenocarcinoma and Mortality in Patients With Barrett's Esophagus: A Systematic Review and Meta-analysis. 8(3), 235-244. https://doi.org/10.1016/j.cgh.2009.10.010

Spahos T, Hindmarsh A, Cameron E, Tighe MR, Igali L, Pearson D (2005) Endoscopy waiting times and impact of the two week wait scheme on diagnosis and outcome of upper gastrointestinal cancer. 81(961), 728-730. https://doi.org/10.1136/pgmj.2004.031104

Kjeld Aij, Frederique Simons, Guy Widdershoven, Merel Visse (2013) Aij KH, Simons FE, Widdershoven GA, Visse M. Experiences of leaders in the implementation of Lean in a teaching hospital-barriers and facilitators in clinical practices: a qualitative study. 3(10), e003605. https://doi.org/10.1136/bmjopen-2013-003605

Platchek T, Kim C (2012) Lean health care for the hospitalist. 1(1), e148-e160.

M. Emiliani (2003) Linking leaders' beliefs to their behaviors and competencies. 41(9), 893-910. https://doi.org/10.1108/00251740310497430

C. Swank (2003) The lean service machine. 81(10), 123-130.

Martin J (2002) Organizational culture: Mapping the terrain.

Yuji Yamamoto, Monica Bellgran (2010) Fundamental mindset that drives improvements towards lean production. 30(2), 124-130. https://doi.org/10.1108/01445151011029754

Lean Process Mapping Techniques: Improving the Care Process for Patients with Oesophageal Cancer

Published

2014-03-03

How to Cite

Lean Process Mapping Techniques: Improving the Care Process for Patients with Oesophageal Cancer. (2014). Global Journal of Management and Business Research, 14(7), 57-64. https://journalofbusiness.org/index.php/GJMBR/article/view/