A Comparative Analysis and Implementation of Activity Based Costing (ABC) and Traditional Cost Accounting (TCA) Methods in an Automobile Parts Manufacturing Company: A Case Study
Keywords:
activity based costing, cost drivers, traditional cost accounting
Abstract
Activity based costing (ABC) is a method for determining true costs; which has become an important aspect of manufacturing/service organizations and can be defined as a methodology that measures the cost and performance of activities, resources and cost objects. It can be considered as an alternative method to traditional cost accounting systems. In this paper we have shown a comparative analysis of application of ABC method with traditional cost accounting (TCA) method in an automobile parts manufacturing company; which would like to increase the sales due to increased demand. For this reason the company needs to know the true cost of the parts prior to deciding as which item is to be produced more. In this case study the results are obtained between the two cost accounting methods by comparing TCA margin % and ABC margin % and these results are used to identify the low-priced and over-priced parts of the company.
Downloads
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
How to Cite
References
Poul Jesper Thyssena, Brian Jorgensenb (2006) Activity-based costing as a method for assessing the economics of modularization-A case study and beyond. 103, 252-270.
Manuel Schulze, Stefan Seuring, Christian Ewering (2012) Applying activity-based costing in a supply chain environment. 135, 716-725.
David Meade, Sameer Kumar, Kevin Kensinger (2008) Investigating impact of the order activity costing method on product cost calculations. 27(4), 176-189. https://doi.org/10.1016/j.jmsy.2009.02.003
Renqian Zhang, Lankang Zhang, Yiyong Xiao, Ikou Kaku (2012) The activity-based aggregate production planning with capacity expansion in manufacturing systems. 62(2), 491-503. https://doi.org/10.1016/j.cie.2011.10.016
Suzhou Tang, Delun Wang, Fong-Yuen Ding (2012) A new process-based cost estimation and pricing model considering the influences of indirect consumption relationships and quality factors. 63(4), 985-993. https://doi.org/10.1016/j.cie.2012.06.010
Carsten Homburg (2004) Improving activity-based costing heuristics by higher-level cost drivers. 157(2), 332-343. https://doi.org/10.1016/s0377-2217(03)00220-0
Miikka Katja Tornberg, Jari Paranko (2002) Activity-based costing and process modeling for cost-conscious product design: A case study in a manufacturing company. 79, 75-82.
Ugo Ibusuki, Paulo Kaminski (2007) Product development process with focus on value engineering and target-costing: A case study in an automotive company. 105, 459-474.
Peter Berling (2008) Holding cost determination: An activity-based cost approach. 112, 829-840.
Adil Baykasog˘lu, Vahit Kaplanog˘lu (2008) Application of activity-based costing to a land transportation company: A case study. 116, 308-324.
Tiago Pascoal, Filomena, Francisco Jose´ Kliemann, Michael Neto, Robert Duffey (2009) Target costing operationalization during part development: Model and application. 118, 398-409.
A. Gunasekaran, M. Sarhadi (1998) Implementation of activity-based costing in manufacturing. 56-57(57), 231-242. https://doi.org/10.1016/s0925-5273(97)00139-4
Michael Johnson, Randolph Kirchain (2009) Quantifying the effects of parts consolidation and development costs on material selection decisions: A process-based costing approach. 119, 174-186.
I. Tatsiopoulos, N. Panayiotou (2000) The integration of activity based costing and enterprise modeling for reengineering purposes. 66, 33-44.
A. Gunasekaran, D. Singh (1999) Design of activity-based costing in a small company: A case study. 37(1-2), 413-416. https://doi.org/10.1016/s0360-8352(99)00106-0
James Shannon W Anderson, S. Hesford, Young (2002) Factors influencing the performance of activity based costing teams: a field study of ABC model development time in the automobile industry. 27, 195-211.
Michael Briers, Wai Chua (2001) The role of actor-networks and boundary objects in management accounting change: a field study of an implementation of activity-based costing. 26(3), 237-269. https://doi.org/10.1016/s0361-3682(00)00029-5
Stephen Stephan Langmaak, Russell Christophe Bru, James Scanlan, Andra´s bester (2013) An activity-based-parametric hybrid cost model to estimate the unit cost of a novel gas turbine component. 142, 74-88.
Published
2013-07-01
Issue
Section
License
Copyright (c) 2013 Authors and Global Journals Private Limited

This work is licensed under a Creative Commons Attribution 4.0 International License.